As experts in glass field for over than thirty years, Corpotrade extensive skills encompass all aspects starting from market study, and involve in every following stages:
All the above stages are completed through 4 phases:
Phase 1: Data Preparation
Phase 2: Layout Preparation
-Phase 2.1: Layout first draft
-Phase 2.2: Basic Electricity consumption
-Phase 2.3:
-Phase 2.5: Compressed Air flow Layout: Calculation of the compressed air needed, pipes thicknesses and best location. Including recommendations for air compressors.
-Phase 2.6: Fire Fighting System (Sprinkles, fire extinguishers, other special fire requirements…).
-Phase 2.7: Ventilation and air conditioning system.
-Phase 2.8: Drainage system (trenches, pits…).
-Phase 2.9: Handling devices and internal Rail transport.
Phase 3: Layout Confirmation
-Phase 3.1: Master plan layout.
-Phase 3.2: Follow up with the customer on the site preparation and implementation.
Phase 4: Installation Period
-Phase 4.1: The support to supplier of machinery, architect and/or contractor during installation on site.
-Phase 4.2: A list minimum number of personnel required for a proper factory production operation, including typical job description, minimum education and experience requirements.
In order to require a specific phase for your factory's layout, Click here to complete a form. (Please complete and return to: e-mail: info@corpotrade.com or Fax:+9611684099)